
Reselling ATE or ATG: calculating the value of your professional service
October 25, 2026
Distributing rising damp devices in Europe: seven decisions to make before your first order
November 4, 2026Handover is an opportunity to explain operation and the next steps. Preparing this stage helps a professional avoid misunderstandings and give the customer continuity after ordering.
Structure the handover
Check the delivered reference, available documents and model instructions. Explain the chosen position and operating conditions. For ATE, describe mains operation according to the instructions; for ATG, explain positioning requirements even though there is no power connection.
Document the starting point
Keep pre-installation observations, dated photographs and a marked plan. If you take measurements, record the method, locations and conditions. Consistent records are more useful than an isolated visual impression or changing the measurement protocol between visits.
Define later decisions
Wall drying is progressive and depends on building conditions. Agree observation stages and checks before finishing work. Distinguish your service commitments from the manufacturer’s terms. Follow-up can be a clearly defined part of your offer without promising a completion date unsupported by the project evidence.
Practical checklist
- Hand over documents for the installed reference.
- Keep a starting record and identified checkpoints.
- Agree the scope and limits of later support.
Prepare your professional offer
Read the model information and instructions below before preparing a proposal. Check trade prices, volume discounts and sales conditions in the shop. Contact HELP HUMIDITÉ PRO to discuss your business enquiry and the information needed for your project.




