
Add ATE wall drying devices to your professional offer
November 17, 2026
Pinsaguel château: measured follow-up in a heritage building
November 18, 2026For contractors, local authorities and building managers, the Ponsonnas Church report illustrates how a wall drying project can be followed through dated observations. The installation took place on 4 May 2015; the follow-up readings are dated 26 May 2017.
Readings transcribed from the report
| Sampling point | Initial reading | Control reading |
|---|---|---|
| Right-hand stone wall | 6.4 gr/100 | 3.5 gr/100 |
| Left-hand stone wall | 6 gr/100 | 2.0 gr/100 |
The sampling points are recorded at 30 cm above the floor and 20 cm deep. The heading mentions a 20 g sample, while the individual lines state 10 g. The units below therefore reproduce the report and are not converted into a common percentage.

What the report concludes
The report describes drying in progress and a device with an announced coverage diameter of 45 m. It also stresses ventilation. The exact device model is not identified in this control report; the case must not be presented as a test of a different current model.
Practical points for the professional proposal
When preparing a similar professional project, record the wall material, sampling position, initial condition and later observations. Include ventilation and separate building repairs in the scope of the discussion.
Use the report as a documented reference
The file describes calcium-carbide testing of material samples. To compare visits, check the material, sampling point, height, depth, sample mass and units. An electronic moisture-meter index cannot be converted directly into grams of water. Keep the source entries and the conditions of each reading with the project record.
Prepare a proposal for the actual building
ATE devices are electromagnetic and require mains electricity. ATG devices use a geomagnetic approach and operate without an electrical supply. Consult the exact model’s specification and instructions, and assess its announced coverage with the floor plan and mounting position. Leaks, penetrating water and condensation need an appropriate response to their own cause.
Questions for contractors and building managers
Does this case guarantee the same result elsewhere?
No. It documents one building and its report. The diagnosis, materials, equipment and other water sources must be assessed for a new project.
When can the walls be refinished?
Base plastering or painting on the actual condition of the substrate, salts and suitable materials. An installation date or a photograph alone does not establish that a wall is ready.
Compare ATE and ATG devices for professionals · Discuss your project with Help Humidité Pro
Source: Humidistop site report supplied for this case study. The readings are transcribed and their comparison limits are explained above.
Before and after renovation
The photographs were identified as showing the church before and after renovation. The viewpoints differ and the dates of the photographs have not been established. They illustrate the building work; they do not measure moisture or show that the device caused the entire visual change.






