Guiche church: renovation photographs and an attested Humidistop intervention

November 11, 2026

Buzy senior citizens’ hall: readings before and after an ATE LC30 installation

November 11, 2026

Guiche church: renovation photographs and an attested Humidistop intervention

November 11, 2026

Buzy senior citizens’ hall: readings before and after an ATE LC30 installation

November 11, 2026
Show all

Ponsonnas church: moisture readings and photographs before and after renovation

At Ponsonnas church in France, the Humidistop file compares two stone sampling points between installation in 2015 and inspection in 2017. Before-and-after renovation photographs complement the record of the building.

From diagnosis to ATE installation

The January 2015 diagnosis describes stone masonry, signs of moisture and cement-based coatings. Installation on 4 May 2015 involved an electromagnetic process with an operating diameter of 45 metres. This case belongs to the ATE technology range.

Two points followed over time

Area 4 May 2015 26 May 2017
Right wall 6.4 g/100 3.5 g/100
Left wall 6.0 g/100 2.0 g/100

The report records samples at 30 cm above floor level and 20 cm depth at both visits. Readings obtained using the calcium carbide method decrease at both points. The inspection describes walls and floors as still drying and recommends maintaining the device in its position and continuing ventilation.

Reading the photographs correctly

The grey stone side view is identified as before renovation; the pale entrance façade as after renovation. The angles differ and the photography dates are not established. The images illustrate renovation, while the report documents changes at the measured points. The entire visual transformation is not attributed to damp treatment alone.

Practical points for professional monitoring

The recorded height of 30 cm and depth of 20 cm provide useful references for follow-up, alongside the sampled material and the location of each point. The 2017 report describes an ongoing process, so ventilation and maintenance remain part of the building’s follow-up rather than evidence of a completed drying outcome.

Ponsonnas church — before renovation, side view.
Ponsonnas church — before renovation, side view.
Ponsonnas church — after renovation, entrance view.
Ponsonnas church — after renovation, entrance view.