Buzy church: an ATG installation with a 60-metre operating diameter

The walls of an old church require attention to masonry materials, coatings and ventilation. The Humidistop file for Buzy church in France documents an intervention within this heritage context.

The installation of 19 July 2016

The report locates the installation on the load-bearing wall on the right-hand side of the church. It describes a geomagnetic process with a planned operating diameter of 60 metres, equivalent to a radius of 30 metres. This ATG reference concerns a separate installation from the town hall in Buzy, which has a different documented diameter.

Keeping a baseline record

The case file includes photographs of the building and readings taken during installation. These establish the initial condition against which later observations can be compared. The selected photograph shows the building rather than the device.

Recommendations for the building

The report recommends ventilating the church, removing damaged plaster and checking the roof. Coatings and possible water ingress remain relevant to the assessment of damp in an older structure.

The readable documents available record the installation but do not provide a publishable final numerical follow-up result. This reference therefore presents the verified building, intervention date, geomagnetic technology and planned diameter without adding an undocumented drying outcome.

Practical points for professional monitoring

For heritage professionals, the planned 60-metre diameter is a sizing parameter rather than a drying outcome. Roof, plaster and ventilation recommendations should remain with the installation report. A later inspection should retain the baseline references so that changes can be assessed.

Buzy church — photograph from the installation report.
Buzy church — photograph from the installation report.