
Bardos town hall: measurements before and after ATG treatment
November 11, 2026
Damp walls before renovation: prepare an ATE proposal for your customer
November 17, 2026Builders, renovation contractors and resellers can include ATE devices in a project involving rising damp. Help Humidité Pro helps you explore the range and prepare an offer that identifies the equipment, your installation service and the agreed follow-up.
Start with the building, not the product name
Describe the affected walls, the likely source of moisture and any access constraints. Distinguish moisture rising from the ground from a plumbing leak, penetrating damp or condensation. Explain why a particular device is being considered for this project, and identify any separate repairs that the building requires.
Match the model to the project
Use the floor plan and proposed installation point when comparing the LC15, LC30, LC30 PULSE and MAX. Keep the exact product reference throughout the quotation, order and handover. A coverage diameter is a manufacturer specification to assess against the layout; it is not a floor area in square metres.
Make your service clear
Separate supply, preparation, installation, documentation and follow-up in your quotation. Confirm the applicable professional prices and conditions before calculating the offer. At handover, give the customer the instructions for the installed model and explain which observations will be recorded later.
ATE models at a glance
| Model | Announced coverage diameter | Power supply |
|---|---|---|
| ATE LC15 | 15 m | Mains power |
| ATE LC30 | 30 m | Mains power |
| ATE LC30 PULSE | 30 m | Mains power |
| ATE MAX | 60 m | Mains power |
Check the specification and instructions for the exact model before ordering. ATG devices belong to a different, geomagnetic range and operate without an electrical supply.
Questions customers often ask
Does an ATE device address every cause of damp?
No. ATE devices are intended for rising damp. Leaks, penetrating damp and condensation need an appropriate response to their own cause.
Can the walls be painted immediately after fitting?
Installation alone does not show that a wall is dry. Assess the substrate, salts and the suitability of the finish before decorating.
Explore Help Humidité Pro for professionals or discuss your project.




